Southern Access Extension (SAX) Enbridge 167 miles of 24″ Pipeline 2015
Woodbridge Delivery Lateral Williams – Transco 2.34 miles of 20″ Pipeline 2014-2015
Paullina-Aberdeen Modifications Mid America/Northern Natural Gas 20″ Mainline Pigging Modifications 2014
Marquette-Ishpeming Mid America/Northern Natural Gas 5.5 miles of 12″ pipeline and 1.6 miles of 6″ (replacement) 2014
Rocky Mountain Crude Expansion Suncor 9.6 miles of 16″ and 1.5 miles of 10″ pipelines 2015-2015
Line 3 Maintenance Enbridge 17 miles of 34″ pipeline 2014
Delhi Replacement TransCanada Replacement of 3,700′ of 2-30″ pipelines 2014
Front Range Pipeline – Adams County Enterprise 28 miles of 16″ pipeline and 5.5 miles of 10″ pipeline 2013-2014
St. Anthony Interconnect TransCanada Interconnect and Meter Station 2013
Kennebec Valley Pipeline (Sappi) Summit Gas/Daniel O’Connell 7.5 miles of 8″ pipeline 2013
Flanagan South – Cushing Terminal Enbridge Cushing Terminal Modifications 2013-2014
Flanagan South – Spreads 3 & 4 Enbridge 301 miles of 36″ Pipeline in 2 Spreads 2013-2014
Bainville Class Change Project TransCanada 301 miles of 36″ Pipeline in 2 Spreads 2013-2014
TGP Station 325 Kinder Morgan   2013
Williams Moab Hydrotests Northwest Pipeline, GP Hydrotest approximately 6 miles of 26” in 3 locations, near Moab, UT, Cortez, CO, and Durango, Co. 2013
Transco Palmerton Pipeline Loop Transcontinental Gas Pipeline Company, LLC Install 3.17 miles of 42″ pipeline loop near Saylorsburg, PA. 2013
Transco Station 303 Transcontinental Gas Pipeline Company, LLC Grassroots horsepower addition to Station 303 near Roseland, NJ. 2013
Dominion TL-465 Dominion Transmission, Inc. Replacement of approximately 9,200’ of 24” near Manassas, VA. 2013
Transco Spread 16 Transcontinental Gas Pipeline Company, LLC Replacement of approximately 2,400’ of 24” near Broadheadsville, PA.  2013
CRC Welding Procedures – Flanagan South CRC-Evans Automatic Welding 36” welding procedures for Enbridge to for their Flanagan – Cushing project. 2013
 Valves 9, 28, 14 & 16 Automation  Pacific Gas and Electric (PG&E) Install new 24″ & 30″ automated valve assemblies. Also, included isolated Valve 9, which involved upgrading and installing vault protection in the middle of a congested residential roadway 2012
 4B & 4D Replacement & TIM-123 Pacific Gas and Electric (PG&E) Replacement of 4,000′ of 30-inch, 3,000′ of 24-inch and the hydrostatic testing of approximately 2 miles of 24″ in three separate sections. 2012
2A & 3A Pipeline Replacement Pacific Gas and Electric (PG&E) Replacement of 5.5 miles of 24-inch pipeline through Menlo Park and Palo Alto, CA just adjacent to Stanford University. 2012
Bend CS Low-Flow Modifications TransCanada – GTN Project Included, remove 36″  check valve reinstall a 36″ Ball valve and a 12″ control valve.  Replace a 42″ underground check valve with a spool of pipe. 2012
2012 Gas HDD Project Baltimore Gas and Electric (BG&E) Installed two 8″ and one 26″ HDD’s in Baltimore, MD. Also installed two 26″ and three 16″ road bores in the Baltimore area. 2012
Rangley CS Modifications Williams – Northwest Pipeline Replace the station Discharge line, install two new After Gas Coolers, Hydro test the complete station and numerous other piping modifications. 2012
 Kemmerer Mine Relocation Williams – Northwest Pipeline Installation of 2.5 miles of 26-inch and 30-inch pipeline near Kemmerer, WY to avoid a mine location. 2012
Nstar – North Cambridge-Putnam Daniel O’Connell and Sons (DOC)  Installation of 19,300′ of 8-inch pipe in the streets of Cambridge, MA near Harvard University. 2012
Midsouth Loops – AL  Williams – Transco Installation of 10.3 miles of 42-inch in two separate loops in Alabama. 2012
Midsouth Loops – NC Williams – Transco Installation of 11.4 miles of 42-inch in three separate loops in North Carolina. 2012
Hedding Road Project PSE&G Rerouted 2,200′ of 8″ Pipeline with a 600′ HDD in New Jersey 2011
Line 571 Replacement Project Dominion Transmission Replacement of 6.7 Miles of 12″ Pipeline near Jane Lew, West Virginia 2011
Line 465 Replacement Project Dominion Transmission Upgrade/Replacement of 4,500′ of 24″ Pipeline in Virginia 2011
South System Expansion Phase 3 Southern Natural Gas 12 Miles of 42″ Looping near Montgomery, Alabama 2011
Eugene to Washougal Station Upgrades Williams Northwest Modifications to 12 separate stations in Oregon 2011
NET Pipeline Project Spectra Energy 28 Miles of 24″ Pipeline Loops in Northeast Tennessee 2011
Eugene Station Modifications Williams Northwest Station Modifications 2011
Beaumont Plant HDD Exxon Mobil Installed a 5,000′ HDD & interconnects within the Exxon Beaumont facility 2010
Ruby Pipeline El Paso Corporation 241 Miles of 42″ in Wyoming, Utah and Nevada 2010
Florida Gas Transmission Phase VIII Florida Gas Transmission 4 separate loops consisting of 134 miles of 36″ between Tallahassee and Tampa, Florida 2010
Plant McDonough Interconnect Georgia Power 3,500′ of 24″ & 1,000′ of 6″ (X-60) in Georgia 2010
Alberta Clipper Enbridge 87 Miles of Dual 20″ & 36″ in Minnesota 2009
Turnpike Loop Williams-Transco Modifications to 5 separate M&R stations in Pennsylvania & New Jersey 2009
Turnpike Loop Williams-Transco 1.2 Miles of 42″ (X-70 .480″ & .600″ WT) in New Jersey 2009
Green Pipeline Project – Spread 1 Denbury Resources 65 Miles of 24″ (X-80) in Louisiana & Texas 2009
Green Pipeline Project – Spread 2 Denbury Resources 205 Miles of 24″ (X-80) in Louisiana & Texas 2009
Plant McDonough Pipeline Project Southern Company / Georgia Power 20 Miles of 30″ in Georgia 2009
Green Pipeline Project – HDD Spread Denbury Resources 80+ 24″ HDD’s in Louisiana & Texas 2008
Gulf Crossing Pipeline – Spread 2 Boardwalk Partners 65 Miles of 42″ in Texas 2008
Sycamore Compressor Station Guardian Grass Roots Compressor Station in Illinois 2008
Bluff Creek Compressor Station Guardian Grass Roots Compressor Station in Wisconsin 2008
Millennium Pipeline – Spread 1 Millenium 60 Miles of 30″ in New York 2008
Millennium Pipeline – Spread 2 Millenium 35 Miles of 30″ in New York 2008
Southern Access – Phase II Enbridge 53 Miles of 42″ / 37 Miles of 20″ in Illinois 2008
Stony Point Compressor Station Spectra Energy Grass Roots Compressor Station in New York 2008
Shamrock Project El Paso 7 Miles of 16″ in Texas 2008

Millennium Pipeline – Double Joint Rack

Millenium

Double Jointing 30″ Pipe in New York

2008

2007 Gulf Coast FPM Project El Paso Replacement of 3,400′ of 24″ in Texas 2007
Maryland Inter-County Connect Williams 3,000′ of 30″, 36″ & 42″ Pipe Replacement in Maryland 2007
2007 Delaware River Station Modifications Williams Replacement of Regulator Assembly & Piping in Pennsylvania 2007
2007 Jonah Expansion Projects Enterprise Station Modifications, 1 mile of 36″ & 2 miles of 10″ in Wyoming 2007
Idaho Hydrotest Project Williams Idaho 2007
Corning Compressor Station Millennium Construction of Compressor Station in New York 2007
End Facing Services Bayou Co. LLC 2,600 (combined) 42″ x 0.600″ & 42″ x 0.750″ in Louisiana 2007
Likely Compressor Station TransCanada Grass Roots Compressor Station in California 2007
Double Jointing Bayou Coatings 17,700 welds of 30″, 36″ & 42″ in Louisiana 2007
Hanover Compressor Station – Phase 1 Spectra-Algonquin Civil work in New Jersey 2007
Southern Access Enbridge 104 miles of 42″ in Wisconsin 2007
Caldwell & Hot Lava Springs Project Williams Installation of L&R’s & MLV’s in Idaho 2007
2007 Oregon Pipe Replacement TransCanada Replace 800′ of 36″ in Oregon 2007
Critterland Pipeline Replacement El Paso Replace 9,100′ of 26″ & 30″ in Arizona 2007
Edison Pipeline Relocation PSE&G Relocate 3,100′ of 12″ in New Jersey 2007

Meeker Station to Meeker Hub Pipeline

Encana

4 miles of 36″ in Colorado

2006

Black Butte Replacement Project

El Paso

Replace 2 miles of 22″ & PIP in Wyoming

2006

Jonah Expansion Project

TEPPCO

77 miles of 36″ & 11 miles of 24″ in Wyoming

2006

Sumuas Compressor Stations Project

Williams

Modifications of existing compressor stations in Washington

2006

Pinedale Expansion – Phase 1

TEPPCO

Installation of HDD & 8,000′ of 30″ in Wyoming

2006

Southern Access

Enbridge

Approximately 25 miles of 42″ in Wisconsin

2006

Sandpoint & Rathdrum Replacements

TransCanada

Approximately 2,100′ of 36″ replacements in Idaho

2006

Meeker Lateral

Enterprise

48.6 miles of 12″ in Colorado

2006

Entrega Pipeline – Spread 2 Entrega 85.21 miles of 36” in Colorado & Wyoming 2005
Entrega Pipeline – Spread 1 Entrega 50.51 miles of 36” in Colorado 2005
Flanagan Forest & Quincy Stations Enbridge L&R and Tank Station Modifications in Illinois 2005
Crown Central Pipeline Project PSE&G 30” & 12” HDD’s 6,000’, 1,500’ & 650’ in New Jersey 2005
Atlanta Division Facilities Modifications Williams / Transco L&R and Hydrotesting in Alabama, Georgia & South Carolina 2005
Sunoco BP Hydrogen & Refinery Project Buckeye Gulf Coast Pipe Lines, LP 18,747’ of 8” & 12” in Ohio 2005
Empire PIP Project El Paso Corp / Tennessee Gas L&R and MLV Changeouts in New York 2005
Cheyenne Plains Pipeline Project El Paso Corp / CIG Spread 2 – Approximately 135 miles of 36” pipeline in Colorado & Kansas 2004
Cheyenne Plains Pipeline Project El Paso Corp / CIG Spread 3 – Approximately 120 miles of 36” & 5 miles of 30” pipeline in Kansas 2004
Cheyenne Plains Pipeline Project El Paso Corp / CIG Meter stations 2004
Rockies Expansion Project Williams – Northwest Pipelines Pegram Loop – 11 miles of 24″; the Kemmerer Loop – 15 miles of 30″ & the Muddy Creek Loop – 30 miles of 30″. 2003
Newark Bay Pipeline Replacement Coastal – El Paso Replacement of 2.5 Miles of 12″, .500 WT 2003
Chiqiutos, Robore & Izozog Compressor Sta. GTB – Shell Partnership The designed plant capacity was 42M Cubic Meters per day and utilized both Solar and Mitsubishi Compression for the 36-inch diameter pipeline. 2002
Spread 6 & 8 DOT Replacement Projects Williams – Transco Replaced three miles of 30″ & 36″ pipeline near Manassas, VA 2002
2002 Mainline Expansion PG&E Construct 34 km of 42” pipeline in Idaho 2001
Horizon Pipeline Kinder Morgan Construct 45 km of 36” pipeline in Illinois 2001
2001 Georgia Replacement Williams/
Transco
Take-Up and Replace of 4 km of 30”, 36” & 42” pipelines South of Atlanta, GA 2001
Lodi Gas Storage Lodi Gas Storage, LLC Construct 56 km of 24” & 30” pipeline in California 2001
Sandhills Pipeline Project Carolina Power & Light Construct 133 km of 30” pipeline in North Carolina 2000
South Coast Loop Williams/
Transco
Construct 40 km of 42-48” pipeline in Alabama 2000
2000 Pipeline Replacement El Paso
Natural Gas
Take-Up and Replace 3 km of 30” pipeline near Williams, AZ 2000
Cardinal Pipeline Transco Construct 107 km of 24” natural gas pipeline in North Carolina 2000